Um Qasr LPG Bulk Storage

(1) Rehabilitation of South Gas Plants Project

Client: KELLOGE BROWN & ROOT SERVICES
Location: Basrah, Iraq
Project overview: The South Gas Plants is one of largest industrial complexes in Iraq, which during the last gulf war was subjected to massive destruction. This project consisted rehabilitation work at three main plants, namely:
NR NGL Facility General Description of Work:
The plan is to perform a rehabilitation & maintenance work at the North Rumaila Natural Gas Liquids facility to support the production of 3000 metric tons per day of LPG. The NR NGL facility receives first-stage and other stage gasses from various compressor stations in North Rumaila and sends broadcut liquids to LPG Central and dry gas to consumers such as power plants.
LPG Central Facility General Description of Work
To perform a rehabilitation & maintenance work at the LPG Central facility in Khor Zubair to support the production of 3000 metric tons per day of LPG. The LPG Central facility receives broadcut liquids from the NR NGL facility and first-stage and other stage gasses from various compressor stations in South Rumaila, produces LPG, and transfers this LPG to the Bulk Storage facility in Umm Qasr along with dry gas to consumers such as power plants & factories located at south of Iraq. The LPG Central plant has its own NGL Units located within the battery limits of the plant and is thus capable of producing its own broadcut.
Bulk Storage Facility General Description of Work
This project is defined as the restoration of the LPG Bulk Storage Facility in Umm Qasr. The plan is to execute construction works at the Bulk Storage facility to support the storage and shipment of 3000 metric tons per day of LPG production. The Bulk Storage facility receives propane and butane from the LPG Central facility. The project is comprised of scope line items associated with the receiving (IRT) and shipping (IST) storage terminals.

(2) Construction and commissioning of Water injection stations.

Client: KELLOGE BROWN & ROOT SERVICES
Location: North Rumaila Oil & Gas Fields, Basrah, Iraq
Work included: Construction and commissioning of CPS 5 & CPS 6, Full rehabilitation of 4 MW motors & pumps, instrumentations, electric substations, pipe modification and construction.
Full rehabilitation & maintenance work was done for the 4 MW motor & pumps with alignment, lube oil, pipe modifications, commissioning & operating the pump sets.

(3) Rehabilitation of QURNA court house

Client: Provisional Coalition Authority
Location: Qurna, Iraq.

(4) Rehabilitation of AL RASHEED Bank

Client: Provisional Coalition Authority
Location: Basrah, Iraq

(5) Supply &Installation of water pumping station and pipeline network

Client: Caritas, Iraq
Location: Qurna, Iraq.

(6) Supply & Installation of Low and High voltage switchgear

Client: State Company for Iraqi Ports.
Location: Um Qasr Port
Work included: Supply, Installation and commissioning of low voltage and high voltage electric switch gear to the passenger complex, Supply Installaion and commissioning of telephone exchange and lighting panels.

(7) Supply and Installation of 11 KV overhead lines

Client: South Oil Company
Location: Fao, Qurna, Muwafaqiya, South Rumaila, North Rumaila – Basrah, Iraq.
Work included: Supply and Installation of 11 KV overhead lines for the main Basrah - Fao crude oil pipeline Cathodic protection system, Muwaffaqiya housing complex, South Rumaila oil fields, North Rumaila oil fiels, 1st June housing complex, West Qurna – Euphrates water intake.

(8) Re-Construction of water pipeline network and pumping station

Client: FAO General Engineering Co. Ltd.
Location: Shuaiba, Basrah, Iraq.
Work included:
  • Dismantling, transportation and re-construction of trunk water pipeline to Shuaiba and Mohammed al-Qasim army bases.
  • Supply, Installation and commissioning of overhead cranes at Basrah Ice Factory.
  • Supply, Installation and commissioning of low & high voltage switchgear at Nasiriya Ice Factory, Amara Ice Factory, Basrah Ice Factory.
  • Repair and commissioning of diesel generators at Shuaiba Ice Factory.
  • Reinforced concrete and other civil work at Shuaiba Ice Factory.